Wednesday, April 13, 2011

First post on new builders log

Recap of the last two weeks in order of completion:

1. Installed pitot tube and ran air lines down rear channel
2. Fitted fuel tanks with cork
3. Installed rear channel behind pilot's fuel tank
4. Riveted flaperon and rear strut attach brackets onto both wings
5. Installed and grounded pilots fuel sender
6. Installed fuel screen and supply fitting
7. Expanded holes in top & bottom wing skins to fit the fuel cap and drain
8. Built and attached front attach bracket for pilot side strut
9. Ran wires for wingtip lights
10. Aligned and drilled pilots wing trailing edge
11. Bent over leading edge of pilots wing and riveted spar cap
12. Fit and drilled wing root skin
13. Fit and drilled pilot wingtip
14. Body work to both wingtips to make flat surface for lights

Total time worked: 40 hours
























- Posted using BlogPress from my iPhone

Location:Parkdale Dr,Johnstown,United States

No comments:

Post a Comment